Our company successfully delivered the core equipment of Xinyang Technology Group Co., Ltd.'s 300,000 tons/year styrene project
- Categories:Company News
- Author:
- Origin:
- Time of issue:2018-02-05
- Views:0
(Summary description)The first and second reactors of the 300,000 tons/year styrene project of Xinyang Technology Group Co., Ltd. designed by Ruihua Chemical Engineering Co., Ltd. and contracted by our company are shipped. The equipment is 14 meters in length, 4.3 meters in diameter, and 180T in net weight. The core equipment of Yangyang’s 300,000-ton styrene project.
Our company successfully delivered the core equipment of Xinyang Technology Group Co., Ltd.'s 300,000 tons/year styrene project
(Summary description)The first and second reactors of the 300,000 tons/year styrene project of Xinyang Technology Group Co., Ltd. designed by Ruihua Chemical Engineering Co., Ltd. and contracted by our company are shipped. The equipment is 14 meters in length, 4.3 meters in diameter, and 180T in net weight. The core equipment of Yangyang’s 300,000-ton styrene project.
- Categories:Company News
- Author:
- Origin:
- Time of issue:2018-02-05
- Views:0
The first and second reactors of the 300,000 tons/year styrene project of Xinyang Technology Group Co., Ltd. designed by Ruihua Chemical Engineering Co., Ltd. and contracted by our company are shipped. The equipment is 14 meters in length, 4.3 meters in diameter, and 180T in net weight. The core equipment of Yangyang’s 300,000-ton styrene project.
During the manufacturing process of the equipment, the company’s leaders paid great attention. The production line overcame the problems of tight delivery cycle and high technical requirements, actively organized overtime and completed the overall hydraulic test, and delivered it on schedule in strict accordance with the owner’s requirements; during the shipping process, The company's production center, comprehensive management department, and shipping unit formulate detailed hoisting and transportation plans, and formulate safety emergency plans for the delivery site, and ensure that the delivery is safe and completed on schedule.
In the manufacturing process, our company worked closely with Ruihua Chemical Engineering Co., Ltd. to investigate and solve the technical problems in production one by one, and strongly invited the old supervisor Jiao Guoying of Nanjing Sanfang Chemical Equipment Supervision Company to supervise and inspect the whole process and inspect the materials used in production. , Cutting, riveting, welding, water pressure test step by step inspection, strict quality control.
Scan the QR code to read on your phone
Hot info
Our company successfully delivered the core equipment of Xinyang Technology Group Co., Ltd.'s 300,000 tons/year styrene project
Development and Reform Commission: increase support for energy conservation and emission reduction
The construction of smart factories in the petrochemical industry welcomes east wind
常州瑞凯化工装备有限公司
Changzhou Ruikai Chemical Equipment Co.,Ltd
Research and development, design and manufacturing of chemical core equipment
Changzhou Ruikai Chemical Equipment Co., Ltd. is located in Rulin Town, Jintan District, Changzhou. Have the third class A2 pressure vessel manufacturing qualification.
Message
Copyright © 2021 Changzhou Ruikai Chemical Equipment Co., Ltd. 苏ICP备18032196号 powered by:www.300.cn changzhou